Dykon shot 7,127 feet of triple ditch on this pipeline project for 12, 16, and 24-inch pipelines.

Dykon Blasting

PROJECT DETAILS

Dykon shot 7,127 feet of triple ditch on this pipeline project.  The contractor was putting in 12, 16, and 24-inch pipelines and a new natural gas processing plant.  Dykon spent 11 days shooting ditch with zero damage to the pipe joints strung on the surface, the newly constructed surface valves, or any nearby structures.

7,127
Linear Feet of Rock
11
Days