PROJECT DETAILS
Dykon shot 1,216 feet of ditch and 31,048 cubic yards of massrock for an HDD site north of the Mississippi River. An 8-inch ammonia line was 50 feet away from the blast area, which Dykon coordinated with the owner for permission to shoot by. Two lifts had to be shot to achieve the 38-foot cut required for the site. Both the construction and blasting crews seamlessly integrated to share the workspace, work safely, and maintain the schedule.