Dykon performed the drilling and blasting for a storm water detention pond for the Shadow Valley Golf Course in Roger, AR.

Dykon Blasting

PROJECT DETAILS

Dykon performed the drilling and blasting for a storm water detention pond for the Shadow Valley Golf Course in Roger, AR.  NEC Construction performed the excavation.  The project required the blasting of 64,962 cubic yards of rock.  Dykon’s phase of the project took from September 1 to October 5, 2019.

64,962
Cubic Yards of Rock