PROJECT DETAILS
Dykon shot 26,837 ft of rock and 1,386 cubic yards of mass rock on these 114 miles of 42-inch pipeline. Crews paralleled an existing line at 45 feet for the entire project. Texas limestone presented the crews with plenty of geological challenges, however our team was able to adapt to each one of them. Numerous seams and voids required meticulous drill logs and custom loading for each hole to maintain vibration limits on the nearby line and ensure the ditch pulled to the required depth.