PROJECT DETAILS
Dykon was hired by a pipeline contractor to do blasting on their spread of the Spectra Energy OPEN pipeline project in OH. This project built 76 miles of new pipeline, and Dykon shot over 6,000 feet of trench and over 3,000 cubic yards of mass rock for ROW access and bore pits.