Tennessee | 2014

In a very densely populated area of Nashville, Dykon safely blasted 18,090 lineal feet of ditch [3.43 miles] along with 13,326 cubic yards of ROW/mass rock.

Dykon Blasting

PROJECT DETAILS

The South Nashville Connector pipeline project had many variables that Dykon had to account for on a daily basis.  Some of which were close proximity to homes and businesses, along with close proximity to roadways and power lines.  With our team of pipeline blasters and drillers, Dykon was able to safely shoot over 18,000 feet of trench and nearly 14, 000 cubic yards in a very densely populated area.

18090
Ft of Trench Blasted
13326
Cu Yards of Rock Excavated