Dykon blasted 36,002 cubic yards of mass rock and used 43,265 lbs of bulk emulsion explosive.

Dykon Blasting

PROJECT DETAILS

In 2010 in Houston, Missouri, Dykon was called in for the blasting of the expansion of an electrical substation. Dykon, in conjunction with Whorton Earth Moving Inc., worked to perform the drilling and blasting, which ended up right at the perimeter fence around the existing substation. This substation was integral to the community, as it provided power for the entire area.  The project was completed safely and on schedule.

36002
Cu Yards of Rock Excavated
43265
Lbs of Emulsion Utilitized