PROJECT DETAILS
Dykon Blasting Corp. successfully executed specialized marine blasting operations for the Omohundro Water Treatment Plant water intake structure located in Nashville. The scope included approximately 350 linear feet of perimeter line drilling and a controlled blasting program consisting of four production blasts to remove up to 23 feet of competent rock beneath a variable water column reaching depths of approximately 28 feet.
This project required advanced marine blasting techniques, including underwater drilling and loading methodologies, precise charge confinement, and blast sequencing designed to optimize fragmentation while minimizing hydraulic energy transfer and environmental impact. The presence of significant water depth provided natural confinement; however, it also necessitated careful consideration of energy transmission through the water medium and its interaction with adjacent structures.
Execution of the blasting program required extensive coordination with multiple regulatory and oversight agencies, including municipal authorities, federal regulators, the United States Coast Guard, environmental agencies such as the Environmental Protection Agency, state wildlife resource agencies, port authorities, and engineering consultants. Each blast event was subject to detailed planning, notification protocols, and real-time operational control to ensure compliance with all regulatory requirements and stakeholder expectations.
A critical component of the project involved vibration monitoring and structural response analysis of a historic elevated bridge structure exceeding 100 years in age, located more than 100 feet above the blasting operations. Instrumentation and analysis protocols were implemented to evaluate both ground-borne and structure-borne responses, ensuring that induced vibrations remained within conservative thresholds appropriate for aging infrastructure. This required integration of advanced monitoring systems and interpretation of frequency-dependent response characteristics unique to marine blasting environments.
As part of the broader technical contribution from this project, Dykon participated as a co-author in a published technical paper examining the structural effects of marine blasting on submerged piers and elevated track systems. This work contributes to industry knowledge regarding vibration propagation in submerged conditions and the response of complex structural systems subjected to controlled blasting events.
This project demonstrates Dykon’s capability to safely and effectively perform complex marine blasting operations in highly regulated environments, while managing risk to critical infrastructure, ensuring environmental stewardship, and contributing to the advancement of blasting engineering practices.