Dykon Blasting Corp. proudly performed the drilling and blasting work for the shaft and raw water intake portion of the Mount Juliet Water Intake Expansion Project in Tennessee, working in support of Garney Construction. This critical infrastructure project involved blasting for both the onshore intake shaft and the raw water intake structure located out in the water channel, where the intake system was designed to feed water through a tunnel connecting the channel intake to the shaft and pump system.
The project required careful execution under demanding conditions. Dykon’s work took place in a highly sensitive environment with Coast Guard considerations, strict vibration limitations, and the logistical challenges that come with blasting for a water intake structure tied to essential public utility infrastructure. Precision, planning, and coordination were required at every stage to ensure the work was completed without disrupting surrounding operations or compromising safety.
Dykon successfully completed its portion of the project safely, on time, and under budget. Our performance on the Mount Juliet Water Intake Expansion reflects the company’s ability to handle complex blasting assignments in regulated environments where accuracy, control, and reliability are essential. From marine-related intake work to heavily constrained shaft excavation, Dykon continues to deliver specialized blasting solutions for some of the most demanding utility and infrastructure projects in the country.