PROJECT DETAILS
Dykon was contracted to do drilling and blasting on the Enbridge Flanagan South pipeline project in Illinois. This job was performed in the dead of winter with stringing crews already ahead of the drilling and blasting. All in, Dykon safely shot over 26,000 linear feet of trench and 9,947 cubic yards of mass rock.