Illinois | 2014

Dykon shot 9,947 cubic yards of mass rock and 26,000 lineal feet of trench.

Dykon Blasting

PROJECT DETAILS

Dykon was contracted to do drilling and blasting on the Enbridge Flanagan South pipeline project in Illinois.  This job was performed in the dead of winter with stringing crews already ahead of the drilling and blasting.  All in, Dykon safely shot over 26,000 linear feet of trench and 9,947 cubic yards of mass rock.

26000
Ft of Trench Blasted
9947
Cu Yards of Rock Excavated