Copper Peak has stood as one of the most iconic ski flying venues in North America since it first opened in 1970 near Ironwood, Michigan. Rising 26 stories above the forests of the Upper Peninsula, the structure is recognized as the world’s tallest artificial ski jump superstructure. Today, the site is undergoing a major modernization effort designed to return Copper Peak to international competition standards and transform it into a year-round training and event destination. Current project plans include reconstruction of the landing hill, slope stabilization, drainage improvements, and installation of a synthetic surface system to support summer use as well as winter competition.
As part of this high-profile expansion, Dykon Blasting delivered critical blasting services in one of the most challenging environments on the project. Working on steep, hazardous slopes under strict vibration limits and demanding environmental controls, Dykon executed the blasting phase with the level of discipline, planning, and field professionalism required for a world-class specialty project. The work demanded precision rock removal, careful coordination with the broader construction team, and constant attention to safety, slope conditions, and site sensitivities.
Dykon completed its scope safely, on time, and under budget, helping move this landmark project forward while meeting the project’s exacting performance standards. On a site where geotechnical stability, environmental stewardship, and controlled ground vibration were all essential, Dykon’s performance reflected the company’s ability to deliver reliable results in complex and high-consequence conditions. Copper Peak is a historic venue being prepared for a new era, and Dykon was proud to play a professional role in that transformation.
