PROJECT DETAILS
Dykon performed the drilling and blasting on the Pineville sewer and lift station in Pineville, Missouri. Dykon blasted 11 man holes, 1 lift station and 2,873 lineal feet of gravity sewer trench.
Dykon performed the drilling and blasting on the Pineville sewer and lift station in Pineville, Missouri. Dykon blasted 11 man holes, 1 lift station and 2,873 lineal feet of gravity sewer trench.