Oklahoma | 2013

Dykon blasted 67,494 lineal feet of trench [12.78 miles] and 3,639 cubic yards of ROW/mass rock.

Dykon Blasting

PROJECT DETAILS

The Sterling pipeline by OneOK Partners is a 540 mile long 16” project.  On this project, Dykon shot over 67,000 lineal feet (12.6 miles) and over 3,639 cubic yards of mass rock for bore pits and ROW access.

67494
Ft of Trench Blasted
3639
Cu Yards of Rock Excavated