Ottawa County, OK | 2009

Dykon drilled 44 ft deep holes in an 8 inch thick web wall while hanging from a crane.

Dykon Blasting

PROJECT DETAILS

This project was done for Ark Wrecking Company of Tulsa.  The job called for the removal of the piers supporting an old bridge that had fallen into a state of disrepair and was too dangerous to use any longer.

Jared and Ryan Redyke worked together on this successful project.  We thank Ark Wrecking for the opportunity to work with them on this project and we look forward to future challenges with them.