PROJECT DETAILS
In 2006, Dykon was contracted to perform all of the drilling and blasting on the construction of the new Branson Intermediate School, in Branson, Missouri. Included in this project was the blasting for highwall stability, mass rock excavation, along with various trenches for utility lines. Dykon shot over 700’ of storm sewer, over 1,000’ of various water lines, and nearly 147,000 cubic yards of mass rock. Over 4,250 holes were safely drilled and blasted over the course of this interesting project!