Connersville, OK | 2014

Dykon blasted 122,897 feet [23.27 miles] of trench along with 23,350 cubic yards of mass rock.

Dykon Blasting

PROJECT DETAILS

The Atlas Pipeline project is a 60 mile long, 24” diameter pipeline near Connerville, OK.  On this pipeline project, Dykon safely drilled and blasted over 122,897 feet [23.27 miles] of trench and 23,350 cubic yards of mass rock!

122897
Ft of Trench Blasted
23350
Cubic Yards of Rock Excavated