"I just want to say that I’ve managed predrill solar projects from Maine to Texas, and Dykon is the best I have ever worked with. No matter the schedule or changes that must be made, Dykon is ready and willing to help and make the job a mutual success. Dykon always finds a way to handle all the ground conditions and obstacles that arise. I just want to thank you for the amazing job you and your team do. "

Justin Northern - LPL Solar

PROJECT DETAILS

Gransolar Group, an international green energy developer with offices in Irving, Texas, in contract with LPL Solar LLC, is building a solar electricity generation facility near Thorndale, Texas. The soil on this project was extremely tough, and conventional drive times for the piles were such that the production schedule could not be met. The piles had to be predrilled to a depth, allowing efficient drive times while maintaining enough skin friction to prevent subsidence or uplift.

Conventional, off-the-shelf drill bits could not meet the production requirements, so Dykon engineered and produced drill bits onsite to handle the difficult material and drill laser-straight holes. A total of 16,381 holes were drilled in 51 days, 2 weeks of which were spent testing to determine the exact hole size and depth required to ensure the piles were secure and would never sink over time.  The drilling for the entire project was completed safely and ahead of schedule.

51
Workdays
16381
Predrilled Piling Holes