PROJECT DETAILS
Dykon performed very close proximity blasting, as referenced in the videos, for the North Sewer Interceptor, in Owasso, Oklahoma. The drilling and blasting was done both next to homes and in agricultural land. Dykon was shooting within 50’ of various homes and within 20’ of various utility lines! In total, Dykon blasted around 7,999 linear feet!