Owasso, OK | 2010

Dykon shot 7,999 linear feet of sewer line and 2,116 blast holes.

Dykon Blasting

PROJECT DETAILS

Dykon performed very close proximity blasting, as referenced in the videos, for the North Sewer Interceptor, in Owasso, Oklahoma.  The drilling and blasting was done both next to homes and in agricultural land.  Dykon was shooting within 50’ of various homes and within 20’ of various utility lines! In total, Dykon blasted around 7,999 linear feet!

7999
Ft of Sewer Line Blasted
2116
Holes Blasted