PROJECT DETAILS
In 2008, McGuire Brothers Construction partnered with Dykon to perform the drilling and blasting on the Spunky Creek Lift Station in Tulsa, Oklahoma. This project had many variables, such as a high water table, and a confined working space. With the help of McGuire Brothers, Dykon successfully blasted 618 lineal feet of trench along with a lift station with 50’ long by 50’ wide dimensions. After blasting took place, the contractor was able to easily excavate the material for the next phase of construction.