PROJECT DETAILS
On the Honey Creek Bridge project in Grove, OK, Dykon performed utility drilling and blasting for the relocation of force main, water line, and gas line trenches. The trenches ranged from 5’ deep to 20’ deep, all of which was blasted alongside the roadway and power lines. One bore pit was blasted along with 1,206 lineal feet of utilities.