Fluor, TX | 2007

In total, we blasted 8,086 cubic yards of reinforced concrete

Dykon Blasting

PROJECT DETAILS

In 2006 Dykon was contracted to perform the drilling and blasting on the Oak Grove Electrical Station, TXU, in Robertson County, Texas. With the use of dynamite and non-electric detonators, Dykon blasted the Unit 1 stack, the ID fan and the precipitator foundation for Fluor Enterprises.  In total, Dykon shot 8,086 cubic yards of reinforced concrete.

8086
Cu Ft of Reinforced Concrete Blasted